![]() |
|
![]() |
|
This website is kept for archival purposes only and is no longer updated. |
|
Fill in the fields below to seach the list of completed and planned GALEX Observations for Cycle 4 planning. Please use J2000 coordinates [A conversion tool is available here.] Please enter coordinates in sexagesimal or decimal format. Updated for Cycle 4! Note:
If an observation is listed with 0.0 FUV integration time, the initial observation may have been done during a FUV detector
down-time. (This is also likely to be the case if the NUV integration time is much longer than the FUV integration time.) The GALEX mission intends to reobserve to complete the "planned FUV time" in these cases, where safety allows. |
|
|