NASA Logo, National Aeronautics and Space Administration

National Aeronautics and Space Administration

Goddard Space Flight Center



Astrophysics Science Division | Sciences and Exploration

This website is kept for archival purposes only and is no longer updated.

XRS-2How it works → FEA

Front-End Assembly

The Front-End Assembly contains the detectors, two of the filters, and the first stage of amplifiers.

Photo of detectors mounted in the FEA The job of the FEA is to support the detectors in the correct position (at the focus of the X-ray mirrors) while conducting a minimum of heat to them. It also houses some electronics, including the first stage of amplification.

Here is a photo of the detectors mounted in the Flight Model FEA. The central section (with the detectors) is kept at 60mK. It is attached to the outer mounting box (which runs at 1.3 Kelvin) by thin Kevlar strands at the corners. The Kevlar supports are just visible in this photo, but are clearer in the larger version.

The electrical connections to the detectors are made by the rows of wires on the near and far edges. The gold wires are actually copper-beryllium springs which keep the wires taut. In this photo, they have not yet been soldered to the external connections.



FEA with CTS filter in place Here is the FEA with the Calorimeter Thermal Sink (CTS) lid, including the coldest of the five filters between the outside world and the detectors. This filter is at the temperature of the detectors (60 mK), to minimize the amount of thermal radiation it emits.

The CTS lid also contains one radioactive calibration source. This is a small piece of 55Fe, which produces 6 keV X-rays aimed at the dedicated calibration pixel. These X-rays have a fixed (and well-known) energy, and can be used to help determine how to convert the measured pulseheight to the energy of the incoming X-rays.


NASA Logo, National Aeronautics and Space Administration
Goddard